29-04-18, 11:23 AM
just had a quick look at the difference - looks like a 2k switch cluster will just plug and play onto a 98 loom and you will have hazards
the electrical magic is done in the switch cluster so as long as the plug is the same (most likely is) it should be plug and play
the electrical magic is done in the switch cluster so as long as the plug is the same (most likely is) it should be plug and play
riding this that and the other
vloggin some bits - https://www.youtube.com/channel/UCvWtJO9...R9RNHx72UQ
https://www.instagram.com/disorderly_punk_yt/
vloggin some bits - https://www.youtube.com/channel/UCvWtJO9...R9RNHx72UQ
https://www.instagram.com/disorderly_punk_yt/