in west cumbria they are replacing expansion joints on a bridge (the little gaps at each end)
its going to cost £500,000 and take nine weeks to cut out to strips of tarmac rebolt in plates and retarmac
they have 30mph average speed cameras at the bridge but only for 100yds before you get there each side
then no-one accelerates to the NSL once they get to the signs - thank god bikes are slim and the cameras are forward facing :evil
its going to cost £500,000 and take nine weeks to cut out to strips of tarmac rebolt in plates and retarmac
they have 30mph average speed cameras at the bridge but only for 100yds before you get there each side
then no-one accelerates to the NSL once they get to the signs - thank god bikes are slim and the cameras are forward facing :evil
riding this that and the other
vloggin some bits - https://www.youtube.com/channel/UCvWtJO9...R9RNHx72UQ
https://www.instagram.com/disorderly_punk_yt/
vloggin some bits - https://www.youtube.com/channel/UCvWtJO9...R9RNHx72UQ
https://www.instagram.com/disorderly_punk_yt/