31-08-15, 01:44 PM
(This post was last modified: 31-08-15, 01:47 PM by fazersharp.)
Quote:So in theory there is only about 2m of cable (6mm) in the void with the insulation. I've had to make a hole in the ceiling to get to the cables (the whole in in what used to be the airing cupboard and is now just a cupboard so it can't be seen). Because it's not seen I can leave the new junction box out of the void and just have cables up there.
That sound ok to me. The bit about not having the cable under insulation (I think ) is just best practice and one of those "when practicality allows" grey areas
Dont forget to use the old cable to pull the new one through
I don't do rain or threat there of. dry rider only with no shame.