10-08-14, 08:01 PM
It was about 4-5 hours of cutting, drilling and filing.
Now I know what I'm doing, should take 1/2 that.
Materials are 3mm steel plate for the bigĀ plate, and 2mm plate for the other two. Plus a couple of 2mm nails as the rivets.
I'd need an exup valve (broken or knackered) to fit the oval mounting hole to though, as this is the important bit if I was to make another.
Now I know what I'm doing, should take 1/2 that.
Materials are 3mm steel plate for the bigĀ plate, and 2mm plate for the other two. Plus a couple of 2mm nails as the rivets.
I'd need an exup valve (broken or knackered) to fit the oval mounting hole to though, as this is the important bit if I was to make another.