18-01-12, 04:06 PM
To clarify the difference between a 'granular sub-base' and an 'MOT Type 1 Granular Sub-base' an MOT Granular Sub base has to meet the requirements of the local Highways Spec Clause 803 and the ticket or the bag should clearly state 'Meets Highways Spec. Clause 803. If this is not stated then then the material does not meet the approval of MOT classification and if this is required by the building regs or Highway for works you are carrying out and you can not provide the proof, they will request the removal and replacement of the correct material.
You can also go to your local Hard Rock Quarry or Aggregates Recycling Plant with a pickup or trailer and collect for between £12-£16/tonne +VAT
Hope this helps.
P.S. Im not a builder - Qualified Quarry Manager and Concrete Rep in a previous life.
You can also go to your local Hard Rock Quarry or Aggregates Recycling Plant with a pickup or trailer and collect for between £12-£16/tonne +VAT
Hope this helps.
P.S. Im not a builder - Qualified Quarry Manager and Concrete Rep in a previous life.

I am the Nightrider. I'm a fuel injected suicide machine. I am the rocker, I am the roller, I am the out-of-controller!